Where we r using split range and ratio controller?
Answer Posted / sivaram
To maintain the PV out put related with two different process
then out put should be split Ex:-Steam turbine Hot well level
control 1) PV: Hot well level 2)split out put1:inc to dec
action 3)Split out put2:Inc to Inc action ,and valves also
designed reverse action.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What is the cascade control
Why boiler chimney area oxyden sensor fixing?
How can measure flow in oil line?which type of transmitter is generally used?
tell me the field & lab calibration procedure step by step with diagram of pressure gauge, pressure switch, pressure transmitter, temperature switch, level switch, flow switch, flow transmitter, temperature transmitter, temperature indicator, flow indicator, level indicator, control valve, thermocouple, pressure indicator (digital & analogue),
䑰ҕ䔈ҕ䖠ҕ䘰ҕ䛀ҕ䝐ҕ䟐ҕ䢐ҕ䥐ҕŹ
I have energy meter for educational project having 0.5s class but my friend need 0.2s class meter , which one is good for that purpose and what is the actual difference of that two classes , need very easy example also.??
How to regulate the flow of Air in 4" line, with max flow of 330 nm3/hr and Pressure of 0.5 bar? please suggest the type of instrument required.
In turbine what does term CDP, NI, NH, HSSOC means.
How to calibrate level transmitter with use of HART?
key phaser where is use and work
what is the responsibility of an instrument commissioning supervisor
in which principle pressure tx,level tx ,flow tx,temp tx ,control valve works?
Which are all the commonly used Bordon tubes in the pressure gauges. Do any one use ASTM A 312 tubes for this purpose?
When doing a liquid seal on a differential flow transmitter , most of the time the sealing liquid will be heavier then the process fluid. For wich application will the sealing liquid be lighter than the process fluid if transmitter is mounted below the process line.
䑰ҕ䔈ҕ䖠ҕ䘰ҕ䛀ҕ䝐ҕ䟐ҕ䢐ҕ䥐ҕŹ