Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why we use DO Fuse in H.T. Line ? What is the purpose of
DO Fuse

Answer Posted / abhijit

basically;DO is dropout fuse the two ends(contacts) of the
fuse connected by a spring ;
if fault occurs;and current value crosses the cut off factor
fuse contacts (spring)will get released;avoiding any problem
to the line

Is This Answer Correct ?    6 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

L.A. (Lightening Arrester) is located at a place from where transmission line enters the transmitting substation. So L.A. (Lightening Arrester) is the first equipments which has to encounter with lightening, high voltage surges and switching surges. It has to absorb energy of lightening, high voltage surges, and switching surges. L.A. (Lightening Arrester) is made up of layers of semiconductors. If these layers can not tolerate energy released by lightening, high voltage surges, and switching surges the L.A. (Lightening Arrester) blasts.

1146


The efficiency of a 100kva transformer is 0.98 at full load as well as half load , for this transformer what is the Copper loss at full load ?

2377


Is a direct shorth ciruit on a branch MCCB in a Low Voltage Switchboard a correct means of tesing the performance for discrimination?

2375


What are linear and non-linear systems?

1148


what is a pilot wiring and whys that called a pilot wiers

2007


I HAVE A 50A MCCB AS PER DESIGN LINE WIRE CONNECT UPWORD SIDE AND LOAD IS CONNECTED TO DOWNWARD SIDE TO THE MCCB.IF NOW ANY ONE CHANGE SUPPLY & LOAD(WISEVERSA) WHAT HAPPENS ? DOES MCCB OPERATION OR WORKING FUNCTION NORMAL IF YES THAN WHY THERE ARE MARKED LINE & LOAD ON MCCB.

2435


can we do the star delta connection of capacitor for 3- phase motor starter.

2081


How to decide DO set rating of Transformer?

1695


Diagram and details of polarity test for Current Transformer 11kv 400/200/100/1A

3094


How to decide cable tray size?

1193


where the lexical paramater will use in fron end?

1929


what is efficient motors and how it is different from normal induction motors

1965


Readings of ER300P Trivector meter

6472


UG cable sizes were specified in sqmm. But practically its not coming to mesure. What's the reason for that? And how they specify the size of the cable?

1976


What is a dc motor?

1235