if my 6 kva UPS gives 20 min. backup at 100 % load, then at
25% load what is the backup time?
Answer Posted / prakash kusuma
at 25% load a 6kva UPS give back up of 50 min
as at 100% = 20 min ok
50% = 40 min
25% = 50 min (40 min + 20 min = 60 min(no load)
- 10 min(25 % load )= 50 min( back up)
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Name different types of bourdon tubes.
I wnat to practice more online type questions .so will you show them me to take a practice test?
how to measure draft pressure in transmitter pl. give its single line digram
There are many type of control cable like pair,core,tried, What are defination each one
why orfice is not used for main steam flow calculation
What is the function of solenoid valve in on/off & shutdown valve and why it is not used in control valve normally?
How can i copy program (parameter) from mm440 (V.F.D.) by using BOP?
Explain the mechanism behind the turbine meter.
ORP sensor working principle?
give some question relative instrument fitter?
what is the calibration procedure for transweigh make weigh feeder?
Yokogawa CENTUMVP R6.09 unable to download to Engineering Station with ExaOPC R3.75
The issue is when I try to download the common project section to the Engineering Station (STN) from the HIS in System View, it is unable to connect. The error displayed is:
WARNING: Could not connect to equalize destination. (7001)
Retrying. Number of retries = 0/1
ERROR: LdXopsLoadMain: connect error 10060
ERROR: Processing terminated due to connection error. (7002)
Equalization end with errors. STN0149
---- ERROR = 2 WARNING = 1 ----
Background:
>Updated the ExaOPC software on the STN from 3.60 to 3.75
>STN operating system is Windows Server 2008 R2
>HIS operating system is Windows Server 2016 Stanard
Solutions attempted include:
>Ensuring all IP addresses are correct and all networked devices can be pinged.
>The ability to ping a device using its host name from another device (
Meaning of the following a. IOP- Manimum; b. IOP- Maximu,;
what is function of SCADA , and how is it work, explain with difination
I m appointed as an automation trainee engineer in small firm in that I am only the one , my company give me a project on s7-200 as i m beginner I don't know how to program so please send me the helpful site so that I complete my project before deadline....please help me out in this critical situation.