Answer Posted / sunil kumar
1. The delete flag should be set for the functional
location.
2. The functional location and it's lower hirachy required
to be free from "Superior functional location" in
"Structure" Tab.
3. All plans, orders, notifications, task lists are required
to be free for this functional location and it's lower
hirachy.
4. Run program RIARCTPV via SE38 transaction and enter in
the functional location.
5. Then execute program RIARCTPA via SE38 transaction, which
will create a file.
6. Execute program RIARCTPD, and select the session from
above step 4, after executing which will delete the
functional location.
| Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
Is it possible to assign user status to a sub-operation in maintenance order?
How would you define equipment/material loaned to a customer?
What level of functional locations should be changed for alternative labelling?
what do you mean by measuring point?
What is the use of the field “standing order”? What kind of order is it?
What is t code to create a catalog code and code group?
What is concept of equipment numbering?
How overheades are calculated and from where the formula is picked?
Differentiate between control keys pm02 and pm03.
Is it possible to change the equipment category once created?
Which task lists are object based?
What is reference functional location?
What are the activities of a sap pm?
Which t code is used to create refurbishment process?
What do you understand by object related structuring of technical objects?