how do we configure EDI output types in SD?
Answer Posted / syed rafi
In the definition of O/P type ,there is one field
Medium:there we need to mention EDI(6) instead of printout(1).
EDI is nothing but to moving data to the next logical system
thru Idoc format.
From there with the help of Integration tool(XI)Idoc format
will be converted into XML file.
From there with the help of B2B tool it will be converted
into Next logical system format understandable language
EANCOM(or)EDIFACT.
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
You want to list all condition records for a certain material or a certain sales organization. How would you do that?
What two ways of number assignment for documents or master data do you know? Explain the difference between them.
What is a handling unit?
What are different sales document in sap system? How to create a sales document?
Is anyone familiar with allocation run – Tcode is Arun_ITA?
Some materials have been blocked for procurement and production. Even though deletion flag is set for a material/plant level, the order can be still entered ( with a warning message). Is there a way to block such transactions for a material flagged for deletion?
What is the standard group condition routine in condition type, what is its importance?
Name at least five features that you can control for the item category?
You want to set up a new condition type. Name the necessary steps you have to do if you want the system to determine the new condition type automatically during sales order entry?
What are the challenging issues you have faced in implementation project/Maintenance project in SD Functionality? How you have overcome that issue???
What’s forward scheduling and backward scheduling activator? There’s a concept called forward scheduling and backward scheduling logic when you do an availability check whenever your order is created system will check whether it’s forward scheduling or backward scheduling, if it’s fatal we have a concept of how is it working, how is that you created as part of your available promise concept? Whatever that date is being considered as part of the logic, whatever the date that is configured or we maintain the data to say know that system tell to create this output back scheduling
What is information structures?
we are using order related billing and billing get generated automaticaly in overnight run.As my q is user has cancel the biliiing document after creating that one.but after cancelation no cancel accounting document get generated.so sales order remain closed and no billing document get generate in overnight run.but when user has created the Credit memo order with respect to cancel billing document the respective sales order get open and billing document get generate in overnight run.so can you please tell me hwo the system come to knoe after rasing the credit meno order that billing document has cancled and sales order has open so the billing document will be craete.please help me regarding thsi query.
I have a shopping mall. If a customer comes to my mall and if he purchase or not anything I give him pen free. How we map it in sap?
what are the five important fields to be maintained in account determination?