Where are u provide laps in columns & beams?

Answer Posted / madhu sudhan

LAPPING FOR COLUMN:- MID HEIGHT OF COLUMN WITH 1.3LD,NOT
MORE THAN 50% OF BARS LAPPED IN ONE STRETCH,THE VERTICAL
DISTANCE BETWEEN LAP NOT LESS THAN 0.3TIMES LAP LENGTH.

BEAMS:- MID SPAN OF COMPRESSION ZONE.

REFFER CODE IS 13920

Is This Answer Correct ?    18 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

psc girder detail

2716


In cement concrete how to check a quality of material also proportion of material at site ?

1433


What is the ideal size of the living room ranges from small to large size?

664


What is the difference between yeild strength and compressive strength of steel???

1792


how much repeitation for conventional and maivan formwork?

1588






How many lbs are there in a yard?

681


Differentiate orthographic and isometric projections?

648


how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high

1440


Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.

1909


how calucate cement sand ratio for plstering

1508


WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.

1581


WAP to print 1) 1 1 1 1 1 1 1 1 1 1 2) 1 2 3 4 5 6 7 8 9 10

2311


What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)

2036


To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?

1500


What are the uses of groynes?

680