Answer Posted / makwana amit
it is the concrete design in a such a manner that the strength ,durabilyty,workability, require for the construction is very well gain in a such manner to that concrete satisfie all above requirement called design concete
| Is This Answer Correct ? | 7 Yes | 3 No |
Post New Answer View All Answers
what is the productivity in aluminium shuttering per day
how to identify np3 pipe and np4 pipe
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?
Exterior Joints,define
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
why & what is perchatage we are using fly ash in concrete?
How to calculate unit weight of concrete for m40 grade.
why we use aggregate,sand with cement in concrete?
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)
Which percentage of carpet area use in plot area of office building.
sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
What is Heavy Concrete & Normal Concrete