what is meant by belt in house construction?
Answer Posted / guest
belt in house construction are mainly use to connect adjacent
column of the structural member of the construction
Is This Answer Correct ? | 10 Yes | 2 No |
Post New Answer View All Answers
how many type of admixtures for water stored structure?
Why should pumping be not used in case of concreting work?
For what purpose bedding is used under storm water drains, explain?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
how to calculate the density for high density concrete ? or is it same as the density of RC?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
please briefly explain calculating or estimating steel quantity for a RCC column?
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com
What is soil enforcement?
How is the strength of cement measured?
Explain the mechanism of cavitations in pipes and drains?
how to shuttering is used in slab
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.