what is meant by belt in house construction?
Answer Posted / karthick
it is the control of ground water for above ground level and
structure to even in construct brick work
| Is This Answer Correct ? | 6 Yes | 4 No |
Post New Answer View All Answers
What expenses counted in contingencies and how much it is in related to built-up area of the building.
What is progress payment?
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
Basic questions of civil engineering
RR masonry rate analysis
Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?
What is meant by cartesian coordinate system?
why development length = 50D . why not 100D
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
what is constat for brickwork
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
Explain what is the difference between built area and super built up area?
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.
The properties of concrete HA-30 and how does it differ with M 30 (specify the important characteristics like workability,strength,mix design,slump test value)and what is the standard relating to it