I have learnt through Net that Debugging a Batch job
involves
1. Submit the job with the HOLD (*YES) parameter:
SBMJOB HOLD(*YES) or Hold the job queue that before
submitting the job
by using the HLDJOBQ command.
2. Determine the job name, user, and number of the submitted
job by using the WRKSBMJOB command.
3. Type the Start Service Job command on your screen:
STRSRVJOB JOB(job name/user/number)
4. Type the Start Debug command on your screen: STRDBG
5. Release the job in the jobq. Type WRKSBMJOB and then put
a 6
beside the job to be released and press enter, or, if the
job queue was
put on hold, release the job queue with the RLSJOBQ command.
6. A display appears when the job is ready to start, saying
that you
can now begin debugging the job. Press F10 to show the
Command Entry
display.
7. Now you can start debugging by entering an Add Break
Point command:
ADDBKP
8.ENDDBG
9.ENDSRVJOB
I tried this for RPG/400 Program and up to six steps of the
above it's ok,but for me no source is displayed and i typed
DSPMODSRC in Command line but still i can't see the sourceif
i press F.10 and enter command ADDBKP i don't know how to
add break points through it,usually i add break points using
F.6 for Interactive job debugs,but since this is batch i
don't know sir,Please help me out.
I was asked this question in a interview,i know only RPG/400
and i’m asking for debugging of RPG/400 program only sir.
or is it only possible to debug BATCH RPG ILE JOB and it is
not possible to debug BATCH RPG/400 JOB kindly help me out
sir
Answer Posted / guest
First Of all Compile your source code with *source other
wise it will not show you source code after press F10 and by
command DSPMODSRC.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is file identifier where we can use?
How Chain operation copies the record's data to the input buffer for the program?
how does the rpg element work?
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.
how do I preserve and clean the array?
What are the types of identifiers?
What is a record lock error?
what are the key words you must use when using a subfile?
Hi Viewers can any body explain me how to update and ahange the already existed data in physical file using subfile ? please explain me with the code if possible?
if there is a module object , how to find the program object for this module object.Assume the module object name and program object name is not same.
When we have a file with Duplicate records and I want to read the unique record from the file. For example a file containing Emp Name as 'Ram' and there are 3 entries of it. So how to read a unique record from File?
what is data area and how it is used in rpg program ?
which program rpg or cl is efficent to update a transaction onto a database file and why ?
what is program status data structure?
How to define data area in RPG program? In which scenario multi occurrence DS is use in AS400?