Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Why do we give DC excitation to AC Synchronous motor??

Answer Posted / b. b. shukla

In a synchronous motor, a rotating magnetic field is produced in stator by giving 3 phase AC supply.Now as per working principle of syn. motor,rotor must have a magnetic locking with stator field. For this purpose we need permanent magnetic poles in rotor so that rotor pole will form magnetic locking with nearest opposite pole of rotating stator field and rotates with stator field at synchronous speed.
Now to form permanent magnetic poles in rotor, DC excitation is fed to rotor winding of synchronous motor.

Is This Answer Correct ?    22 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

diameter of cable and core is doubled then the value of capacitance is

4291


hwat type of motor is used in thermal gas turbine hydro nuclear power plants and why

1887


how line turns ratio changes in 3 phase with change in connection

1977


I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?

1870


Why derivative controller is not used in control systems?

1173


When we have earthing mesh or underground earthing network in industrial plants, weather we have NT-S or NT-C-S kind of earthing system, so eventually weather we must use 4 or 5 wire in 400 volt level (For example 3×150+70 mm2 or 5×150 mm2) in this connection I would like to know exactly the paragraph of IEC or IEEE number

2163


how to select proper cable for ct wiring so that drop within the limit.

1968


i have attended the interview on 4th June,08 at Kolkata in IOCL, can anybody tell me what is its result

1974


What is the RMS and DFT principle of analogue maesurments. Which way they are advangages. where which princples give optimum results.

2666


there are cam operated switches - why we call cam operated , What is cam ?

1904


what is the difference between droop mode and ischnorous mode in thermal powerplant?

2654


how to determine Sq.mm size of finolex power cables.

2001


We are designer please help me calculate the size of 11kv cables from step up transformer to M.V panel, total load is 5 mega watt distance 900 feet (used aluminum type cables) please provided formula for calculate the cable with example.

1647


hi frds, i m electrical engineer.can i get cdr for electrical engineer if u have then send me on my mail id its jayesh_ee88@yahoo.com.please help me frds

2187


hr round