what are the construction sequences in DAM, Hygh Way /
Road, Thermal Power Plant, Hydro Power Plant, Tunnel ?

Answer Posted / vydehi

The construction sequence is High way/Road, Tunnel, Dam,
hydro Power Power,Thermal power plant.

Is This Answer Correct ?    4 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?

2596


Explain the mechanism of cavitations in pipes and drains?

666


Any strength is a stress but any stress is not strength

1280


how to calculate the steel in 500yard

1890


As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.

1432






How will you Engage Labours on Site?

1414


What is kn measurement?

741


What is critical path method (c.p.m)?

701


what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix

4521


How do we calculate absolute pressure?

775


how much need sand and cement for 1 cft roof construction?

3969


Define What is passive earth pressure ?

697


Technical Question of Civil Engineering

1894


How you can use different dimension tools in cad? What are the different dimensions available?

686


i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr

1550