If concrete fails in cube strength as well as non
distactive test? what to do? for example grade of concrete
is M35, cube strength is 26.1 n/mm2 after 28 days and non
districtive test strength is 28.1 n/mm2 after 28 days. i am
not distroying the rcc memeber.
Answer Posted / shrikant
We should go as per IS code of practices. There is factor
of variance mentioned in IS code.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
How to calculate material and labor required for 100 m2 plaster?
What is Grid floor and mention its advantages ?
1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?
What does civil engineering mean?
specifications of fe500 steel
What is diversion tunnel in a dam?
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
how much cement and sand required for 100sqm of wall plastering in different proportions
Which stone is best for wall construction Laterite Stone or Cement Blocks
How to calculate canal slope curvature qty!
What is braced excavation all about?
How you can turn off the display for dimension in CAD?
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel