Answer Posted / rocky
civil means construct and contact the buiding works
| Is This Answer Correct ? | 5 Yes | 4 No |
Post New Answer View All Answers
Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
Can we use concrete of slump cone in cube casting in which we have already measured slump?
What is need for setting limits?
How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel
When column of building is abutting the boundary line,then suitable footing advised is
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
how to calculate the weight of concrete
Explain what is the difference between built area and super built up area?
Why is the use of granular sub-base in concrete carriageways not preferred, explain?
WHAT GOAL DO YOU HAVE IN YOUR CARRIER?
Different sizes of Hollow blocks and its weight. Thanks.
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
What is meant by scaffolding coefficient?
what do you understand by M25 concrete