Answer Posted / rocky
civil means construct and contact the buiding works
| Is This Answer Correct ? | 5 Yes | 4 No |
Post New Answer View All Answers
can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
Explain the various stages of the project planning process in construction?
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel
How to calculate chejja reinforcement
What is meaning of tlc
in 100 cft = 1350 bricks in 100 cft = ? bloks
column at edge of a framed structure is uniaxial or biaxial. and is an interior column is biaxial
The foundations are placed below ground level, to increase?
How to check slab shuttering level.? Or check list for slab ?
Explain the mechanism of cavitations in pipes and drains?
What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet
How to calculate steel for beam slab and column
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)