what is the difference between volume and weight batching
and which is better?
Answer Posted / vishal r
Volume Batching : The materials of concrete are to be taken
by Volume as the proporion.
Weight Batching : The materials of concrete are to be taken
by Weight as the proporion.
Weight batching is prefered as we are getting better result
than Volume batching.
| Is This Answer Correct ? | 90 Yes | 11 No |
Post New Answer View All Answers
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
Why Vitrified tile are getting pop up.
what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
can we use PPC for concrete wall, If yes, what is the concrete (PPC & OPC) grade for Non- load bearing concrete wall, load bearing concrete wall & for cellar retaining wall.
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
What is unit weight of roadway layer.. 1.bitumen 2.sand 3.soil 4.concrete 5. aggregate give me some reference for this answers
how to design and calculate materail quantity for concrete speedbreaker ?
in block masonry l=10',b=0.5',H=10',Calculate cement ,sand and no.Of blocks?
material used for mendrel use to bend epoxy coated rebar
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
What is the diameter of the 3"inch nails?
What is the material consumption- cement,sand,tiles etc for Toilet dado?
How much cum. Brick work can do by 1 madon
What are the basic use of runners and standards of pipelines?