What is the order of MIX Design of concrete?
a)Cement :Stone:Sand
b)Cement :Fine aggregate :Coarse Aggregate?
Answer Posted / suresh
(b) cement:fine aggregate:coarse aggregate
| Is This Answer Correct ? | 17 Yes | 1 No |
Post New Answer View All Answers
What happens to Load at yielding ?
20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks
What is the origin of name railway sleepers?
what is the most suitable foundation when construct a bird watching tower in a marshy land
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?
how to calculate MR 9(derivation)
How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.
why we use 19x9x9and 20x10x10 but not other
115mm thickness brick work how to required mortar
indian standard split spoon sampler
how to workable concrete cube test M-25 design mix
What you understand by richter scale?
sir how can we find the cement and sand required for making 4" drop
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.