Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is gauge and gage

Answer Posted / mohd. abdul kalam

In railways, Gauge length is the perpendicular distance
between the two rails.
---------------

---------------
}in fig, gauge length is perpendicular distance between two
dotted lines.There are 3 gauge lengths in Indian railway
standards.
1. Broad gauge-1,676 mm (5 ft 6 in)
2.Meter gauge-1,000 mm (3 ft 4 in approx)
3.Narrow gauge-762 mm (2 ft 6 in)

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to calculate total cost for slab 35'×8'

1881


IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,

2258


Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)

1954


how many litres of enamel paint required for 5000 sft of site?? 

1873


Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem

2702


why demand factor less then 1 ?

2141


What are your goals?

2847


in 100 cft = 1350 bricks in 100 cft = ? bloks

2935


how can we calculate steel value, depending on load

2076


Draw the cross section of a boundary wall and label its part with detailing?

4558


what are the ffactors you considered choosing the course?

2126


Pls help me to arrive the rates for centering shuttering for highbay using H-frames?

2295


door and window wood work calculations and different methods

2081


factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard

2058


for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area

2312