What is the difference between working in support project
and implementation project?
Answer Posted / guest
Support project mostly involves tickets handling whcih are
faced by the users and going for configuration or any based
on that.
Implementation involves customise and configure business
process of client in to SAP from old system whcih includes
different phases.
Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
How does SAP get to know whether the material is available or not? how does it determine MAD? What exactly happens in sending TOR?
what happened when you overrate the customer?
Explain the term "fit gap analysis"?
im encountering problem like copying is not possible b'coz an entry is missing in table tvcpl:tor lf
How to same in period and FY by using Transaction code MMPV
what is the use of delivery and billing documents header and item
Where do we assign calender in the master records?
How would you configure ‘partner determination procedure’? Explain
Describe the process flow for a credit memo.
Define credit control area (t014)?
what are all the shipment activities.explain this process pls. its very urgent and what is t-code.
Can any one explain how we will configure milestone billing , periodic billing and which scenario we will use?
What is a standard transport layer in sap ? : transportation management
What are mrp types?
A Client wants to connect his SAP ECC system to his SAP CRM system. What do you want to do to enable the integration. a)Install the plug-in on the CRM system and connect to the R/3 adapter in the ECC system b)Install the XIF adapter on the CRM system and connect to the R/3 adapter in the ECC system c) Install the XIF adapter in the ECC system and connect to the R/3 adapter in the CRM system D)Install the plug-in on the ECC system and connect to the R/3 adapter in the CRM system