Why? We r used 50sq. mm. And above size cable in 3.5 core and below size are used in 4core
Answer Posted / diwakar
We even have three phase loads used in 25 and 35 sq.mm.. cant say that as the reason alone.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How many types of electrical earthing are there?
is that a problem if i connect a single phase load to a secondry delta connected transformer but i get a neutral from other transformer i the system?
define the non synchoronism of synchoronous machine in general g or m??
Importance of fault current in power transformers and how to monitor the same? How is it different from winding temperature?
what is the chemical name and formula of refrigarent R-134a.
As per standard, transformer body earthing and other Equipment earthing (Equipment earthing) did not connect. but in LT side termination we are doing metal glanding in both side Transformer to PCC Panel through armoured cable, now X'mer body earthing and PCC Pane earthing (Equipment earthing) both are connect.is this safe for X'mer or other equipment?
SIR, GIVE ME OPGW SAG CALCULATION FORMULA I AM DAE ELECTRICAL. THANKS
how can i find ct ratio of meter by seeing name plate of meter and how it should be used in MF calculation if it shows only-/1???
dg earth connect only in the amf panel or not why
Is it required to lay 2 runs of GI wires along with armoured cables from one power DB to another Power DB?
7- What is the Dissipation Factor and the difference between it and Insulation Resistance Test? 8- What is the task (function) of DC and AC reactors in power plant? 9- What is the task (function) of (open delta with earthed) in some types in transformers? 10- What is the base of the selection of the vector group in transformers? 11- What is the zig-zag transformer and its function by drawing in large detail? 12- What is the polarity ? 13- Why we make short between phase(R) in high side and phase (r) in low side in vector group test? Where High Side ( R ,S and T ) and Low Side ( r ,s and t ). 14- What are the time on delay and time off delay? 15- What is the vector group? 15- What is the task (function) of different types of vector group such as Dyn11 , Dd0 , YNd1,……..,?
What is the importance of counter based plan & how is it scheduled?
I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?
how can i reduce sparking without stepdowning the voltage
What is the universal motor?