Answer Posted / er, shivanand
It should be 5 to 8% o total volume of sand
| Is This Answer Correct ? | 10 Yes | 2 No |
Post New Answer View All Answers
give me the rate analysis for Bituminous Macadam and SDBC
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
how to identify the failure of building by expansive soils
what is SDLC ?and write a 'c'program for to swapping the three numbers?
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
What is a kip?
difference between trapezoidal and pedestal footing and how the load acts on that
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
how can calculate the compressive strength of concrete cylinder by water cement ratio ?
how can we calculate steel value, depending on load
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
How to calculate Volume of Wet cement concrete for a specific grade?
what are the values of compressieve strenght?
Explain the mechanism of cavitations in pipes and drains?