Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How much UG cable size should i use so as to accomodate a
ground + 2floors house.
A 1.5ton AC & geysers(2) in each floor with lightings

Answer Posted / muthuvel

As per your details given here g,1&2 floors are having 2
apartments so totally 6 apartments for that at-least we
required 18+9(geyzer)+9(ac)+2(pump)=38kw

so the full load current is 65A for this 3.5cx35 sqmm
al Cable is enough.If we consider Voltage Drop Cable
size will get more(If the length is more)...

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

In PFI plant one stage capacitor connection is directly connected(with out megnetic contact controll). but why?

2222


In our factory so many iron pillors are exists for supporting the shed/Hangar. If do more no of earthings at one piller instead of doing more earth pits in many locations and running earth strip around the hanger, I can save the money. Please suggest this method is acceptable as per Is specifications though the Earth resitance of the farthest piller is with in the limits as per IS specifications.

2061


Briefly describe means used by electricity suppliers to influence the flow of active and reactive power in power networks (one for each type)?

1903


What are the classifications of heating element?

1981


what are the installation procedure of high voltage power transformer,CT,CB&PT?

2010


Starting Time of LT & HT Motor

1886


Explain the operation principle, advantages and disadvantages of the following converters: a) A 12 pulse converter b) A Switch-mode inverter c) A thyristor inverter

1965


We are planning to synchronized DG's with our captive plant in the event of black start of plant, but before sync we checked voltage of DG with our plant voltage and it varies from 5 V to 450 V. So in this condition how we can sync DG with plant ?

1600


we are having 15kw and 3kw motor both can run in same time , instead of using copper we are using ug aluminium cable , 35 sq.mm is suitable for its current carrying capacity..?

1688


What Is Connection APFC Panel In Compony.

1402


what is difference between window type and wound type transformers?where we will use window type and wound type transformers?

2128


Rules and standards of electrical control wiring ?

1078


There is air in a room . the top and bottom of the room are at constant temp. T1 and T2. DRAW THE temp profiles if a. T1 greater than T2 b. T1 less than T2

1849


ELECTRICAL DRIVES: can a motor load system with passive load torque can have equilibrium speed in second quadrant

6264


On what basis the the size of Lightning arrester for buildings are selected ?