when does sedimentation occur
before filteration, along with it, along with chlorination,
after chlorination?

Answer Posted / neha telang

It occurs before Filteration

Is This Answer Correct ?    13 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.

1326


You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.

1743


Formula for calculating the volume of bulb in underreamed pile

4396


what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..

2038


How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?

1703






why does the most of civil engg is not intersted to going for teaching field?

1610


What is reinforced concrete?

687


what is derating factor in cable? what does it mean if derating factor is high/low in terms of thermal resistivity of soil?

2100


How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.

1790


Explain the importance of moment of inertia?

760


Hi.. Can i get hel in finding HPCL previous year question paper? plz help me in finding thiss..

2406


Please tell me vasthu room sizes. Thanks.

1762


please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)

1349


What is different between DI Pipe and CI pipe?

1582


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

1943