What is cutting Length of stirrups of a beam 300mm*300mm.
Answer Posted / sundar rajan
For 10mm rod,
1.substract 25mm- cover on both sides
(250+250+250+250) =1000mm
2. number of hooks--2,so {(10*d)+(10*d)}= 200mm
ADD =1200mm-------A
3. 90degree bending(elongation) in 4 sides + 1 hook bending
(elongation)
4. for each elongation, substract(2*d). now here 5
elongation so =(5*2*10mm)----B
ANS: A-B= 1200mm-100mm = 1100mm.
| Is This Answer Correct ? | 18 Yes | 3 No |
Post New Answer View All Answers
Why M15 is replaced by M20 when ammendment are made in IS456 in 2000?
Define What materials were used to build the Golden Gate Bridge?
What will you do if a portion of load bearing wall collapses under your supervision?
If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building
What is difference between engineering stress and true stress?
How are freeway bridges built?
what isload waring calculation
For a washout valve why are two gate valves required in normal practice?
How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.
How to find CN by using arcgis 9.3?
What is demising walls?
Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?
What are the basic use of runners and standards of pipelines?