in moon night and stars r shining with moon n u stand n lloking towards sky if u have no copass, and no any other civil lab equipment, then how u point out the North direction for serveying??
Answer Posted / md irshad anwer
A fixed direction is given to us by the Pole Star, As its
known as North Star. so we could easily point out the North
direction by heading towards Pole Star.
| Is This Answer Correct ? | 5 Yes | 1 No |
Post New Answer View All Answers
what is the ingredient value of 40mm and 20mm aggregates?
what is called the inverd level of mabhole chamber?
How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction
How high should the water tank be to provide a 60 psi at base of this water tower?
what is the use of water bar in water tank and is this an extra item in estimate?
Howmuch bend to be provide for 200/600 BEEM
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure
What will be the exam pattern and syllabus for j.e post of haryana staff selection commision? Advt no. (02/2015) Some people says it would only be objective type question papers while others say it would be same as ssc (1 objective,1 conventional) ?? Please answer this question it is needfull to all.
how much quantity of cement,sand and water required for 1 sq feet flooring work .
Hi I had missed my mark list (first year-apr2003)how i search in my old mark details in internet and which web site? pl inform me in full details..
does a b.tech civil engineer fresher supposed to know how to design rcc structure?
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
What is the l/d ratio of cantilever beam?