What is Leastcount of
1. Total station
2. Theodolite
3. Dumpy level
4. Plane Table

Answer Posted / kamlesh mahajan

Total station=1 sec. Theodolite= 20sec. Dumpy
level = 6 minute. Plane table is used for sighting
and drawing si multaneously.

Is This Answer Correct ?    12 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How many lbs are there in a yard?

684


i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh

1844


what is the Asfalt test?in road constraction..?

1654


how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour

1099


How is calculate the cube molt

1798






if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete

1624


Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings

1655


Basic civil interview questions 

1869


What is geopolymer based concrete?

2158


why & what is perchatage we are using fly ash in concrete?

2205


660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need

1109


What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.

1611


as per is code, what is the minimum content of opc and ppc cement for rcc structure

1748


what is anchorage length,lap length and (dont remember the last one)

1743


How to calculate the load of partion in flat slab if we use brick?

1395