what is the weight of a cubic meter of M10 concrete?
Answer Posted / mohammed salahuddin
See whatever the grade it is the weight of the 1 cum of
concrete is 2.4 tons. Refer Civil Engineering Handbook.
| Is This Answer Correct ? | 42 Yes | 8 No |
Post New Answer View All Answers
How high should the water tank be to provide a 60 psi at base of this water tower?
cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building
a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement
What are the important hardware systems used for cad?
what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?
How much material is required for constructing a 2 Lane 2Km rigid pavement road
rate analysis hiring of generator 62.5 KVA
What is the maximum crushing load in Kg & crushing strength in N/mm2 for M25 & M 15 Grade concrete
What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m
Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
what is the productivity in aluminium shuttering per day
What is the cost difference between site mix and ready mix concrete per cubic meter
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.