Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is unit weight of steel

Answer Posted / vijayesh

7850Kg/m3

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

hai, kindly send anyone for output workers format details for construction project in foundation to finishing.

1521


how to do cementicious paint for rcc walls of cw pump house

2034


where i can get material costs on weekly basis

2155


What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?

2727


What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?

3091


construction workers how much time take one work or qty

1821


one steel fixers how much ton steel fabrication he will do same how much tone he will binding?

1956


WHAT GOAL DO YOU HAVE IN YOUR CARRIER?

2433


As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.

1958


I want to join bhel because

2188


What is the difference between undo & redo?

1269


The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?

2231


What in your opinion makes you the most suitably qualified candidate for this post of civil engineering technician?

1150


What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.

2597


How are freeway bridges built?

1264