Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

WHAT IS THE ROLE OF ELECTRICAL & ELECTRONICS ENGINEER IN
TCS.

Answer Posted / arun kumar

capacitor design

Is This Answer Correct ?    3 Yes 18 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

For electrical designers what are the standard should know? i want learn about this standards. how to get information/reference. anybody help in this regards please.

2137


what is the operating time for LBB and how does the LBB relay realise whether cb is opened or not?

1981


What are the basic components of the feedback control system?

1053


how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating)?

2263


A 3-PHASE TRANSFORMER IS USED TO STEP-DOWN THE VOLTAGE OF A 3-PHASE, 11KV FEEDER LINE. PER-PHASE TURNS RATIO IS 12.FOR A PRIMARY LINE CURRENT OF 20A, CALCULATE THE SECOUNDRY LINE VOLTAGE, LINE CURRENT AND OUTPUT KVA FOR FOLLOWING.A)STAR- DELTA.B)DELTA-DELTA.

3061


is there any device that works properly accept relay, it may be fuse but if i want fuse of 33kv 300 amp it is avaliable, pls give me details

1996


the grid connection required for a 50 MegaWatt fotovoltaic powerplant is higher or lower than 35kv (high or medium tension)?

1849


explain the types of drives

1977


What is the difference between a Root Locus plot and a Bode plot?

1276


What is the previous name of Cox's Bazar

1989


what is the clear formula to calculate cable size for a load

1964


what is the IEC standard for Power Cable installation in onshore (like in direct buried ground or above groung)

2711


i want wipro vlsi placement pattern please send me

1774


What is meant by time harmonics and space harmonics?

2805


What is the rate of WCT on the Electrical Contracts comprising of DG Sets and Civil Works in Delhi ?

2191