Basically Three types of load are there..
1.Resistive load
2.Inductive load
3.Capacitive load
Resistive load always having unity power
factor.So we do not consider that type of loads.
In Inductive load Having Lagging power
factor,so we must improve the power factor.For this
improvement we can choose capacitor,Synchronous Motor
connected in parallel.These Loads give the Leading
current ,so it is compensate the lagging current...
| Is This Answer Correct ? | 88 Yes | 3 No |
Post New Answer View All Answers
why current flow to the opposite direction of flow of electrons???????????
how i calculate the syncrones generator NGR resistance .if we have a 6mw generator line voltage of generator 11kv also line current 393.3 ampere.
what is the AC Plant and how can do the work with parts and picture tell us 150 Tr
What will be the size of copper cable (each for 3 phase and 1 neutral) from Service connection Kit-Kat to Panel Board (i.e. to main switch) for a 6 pole 3-phase AC induction motor of 200 H.P. capacity? Amp-255 A, Frequency:- 1450 rpm.
what are the Alarm, Trip & Safety equipment (Issues) present in Power Transformers pls Mail it to ashokbabunhce@gmail.com
We are preparing another project which involves Waste heat recovery from a 1 MW GE Engine. The Engine in particular gives out flue gas at 487Deg C with a flow rate of 5650 kg/hour and this can be cooled to 180 Deg C. This gives a thermal output of ~ 594 KW that is available for input to VAM via heat exchanger / boiler. Additionally 581 KW will be available from engine jacket water (temperature profile 80/ 80 Deg C and a flow rate of 50m3/hr) Our estimation is that 300 TR of cooling is possible with a suitable VAM machine(s). Please advise what is the most suitable arrangement with maximum TR and min Capital expenditure. plz reply me as early as possible
two phases with neutral supply can be taken in 3C X 10 sq.mm cable .
How generator NPS(NEGATIVE PHASE SEQUENCE TEST)TEST WAS DONE? PROCEDURE WITH DETAILS?
what rectifiers is and what are the types of rectifiers?
explain the Trip supervision circuit
What is the requirement of grounding the neutral of single phase generators on load? If the neutral is not grounded, what will be the effect?
Define gain margin?
y we use neutral,all r told its used to for closed path..k its a just used to closed path,in a transmission line y we put same conductor used n both phase and neutral..if we use less than phase conductor in neutral mean we ll reduce cost its right r wrong..if we use mean any problem occur in transmission line..
Hi Friend I am used multimeter to measure the voltage between R Phase(SS1) to R Phase(SS2). In SS1 is connected with UPS loads. But I am getting voltage between these 2 R Phases. Please give some idea friend
where are the circulat the diesel in DG parts name with pictue