It's long detailed procedure ranging from 20 50 pages.
Can't be described here. If we summarize in core key dots,
HGPI is:
Dismantling of components like fuel gas or oil piping and
nozzles assemblies,Combustion chambers, liners, flow
sleeves, transition piece assemblies, turbine casings, air
compressor discharge casings, barrel, diaphragm assemblies,
interstage nozzles between turbine bucket wheels, exhaust
casing etc etc.
Then, carrying out detailed inspection of the dismantled
components by dye penetration test, MPT, radiographic
inspection, if required, for cracks detection. material
loss inspection, visual damages, erosion, corrosion etc
deformation and several other issues.
Repairing or replacing the damage components.
Re-assembly of all hot gas path components after cleaning.
Measurements are recorded during each disassembly and
assembly step and recorded on manufacturer bland formats
for future record.
| Is This Answer Correct ? | 24 Yes | 1 No |
Post New Answer View All Answers
why the path of a satellite is always elliptical with earth not at the centre of the ellipse?
Who built the tr alaska pipelene?
What type of pump is are commonly used in auxiliary boilers?
What do you mean by the term thread size please explain what does 0.125 inch stand for in 0.125 inch npt thread?
What should you do before you start the engine?
What is a radial-flow turbine?
Name any four commonly used refrigerants.
Methods to dry up wet induction motors?
mechanical question for the insrumentation
What is the purpose of increasing the pressure on the F.O. system of the engine?
List the energy saving opportunities in air compressor system.
Why fatigue strength decreases as size of a part increases beyond around 10 mm?
Explain how do you calculate cooling energy?
Can any one plz help me to find aptitude questions on UG.NX software??
What is net refrigerating effect of the refrigerant?