What are the test involved in DG auto synchronizing panel
before in manufacturing place before dispatch.
Answer Posted / engineered
DG auto synchronising panel are equiped with Numerical
series relays,
At manufacturing facility grid power is used for
synchronisation purpose.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Why space heater is required for each verical bus bar chamber? if one space heater is adequate or not for anti condensation?
What is knee point voltage?
What are protections for dty type transformers
Alternator rotor earth fault relay circuit
plese send me the oces/dgfs sylabus and previous year question pattern of electrical engg.?
Consider three heater bank connected in 3 phase star with neutral.Each heater bank connected in each phase.So each phase get 230 volts supply.my question is,during balance condition, current flow in neutral or Not
why booster transformer is used in sumpners test conducted on transformer????
what is PDU in transformer?? which company manufacture??
Explain Even and Odd signals?
75 kw motor take 45 amp in no load delta in star 10 amp but in load it will take 160 amp but IR velue of winding above 500 at 1kw ph to earth and ph to ph. what problem it should be?
What was the Dg set radiator and lube oil temperatures trip in ACB
In siemens S7-300 PLC, what is function and function block ? What is the difference between them ? When to use function and when to use function block ?
what is integrated ac contact circuit
is that any software calculator to calculate the size of cable
How to select a transformer group to connect a 0,433 KV generation with 33 KV grid in bi directional flow of current