Which IS Codes used for the steel reinforcement work?
Answer Posted / dharam vir singh jp
IS 800
Is This Answer Correct ? | 13 Yes | 9 No |
Post New Answer View All Answers
What is type failure of road surface? how to repair the failure of road surface?
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
can any one explain bar bending schedule of bems and columns and slabs ??
How much does it cost for a R.C.C cover slab of size (450mmX 600mmx 100mm) double rf net given in feets using hand mix concrete?
Specific gravity of cement?
How many days should curing of plastering, brick work and concrete
How do you calculate reinforcement weight of steel?
How much cum. Brick work can do by 1 madon
Define What is the force exerted by the Tacoma narrows bridge?
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
what is mean by reestimation?
Is there the dry coefficient of cement is constant?
how much cement sand n bricks required in im3?and how much in plaster?
Explain what is Hybrid Foundation?