How to calculate cement and sand quantities in cement mortar
As 1:1,1:2,1:4,1:6 ?
Answer Posted / will
Say cement sand ratio is 1:6
calculate the quantity of mortar in 1m2 of brickwork, say
it is 0.01912.
just devide by the ratio considering 60% for wastage, say
0.01912/1*0.6=0.01147 volume of cement in the mortar.
Divide the total volume of cement by 0.0345 which s the
volume of 1 bag, say 0.01147/0.0345=0.33257/m2*number of
m2, say 100m2=34bags.
| Is This Answer Correct ? | 5 Yes | 9 No |
Post New Answer View All Answers
what do you know that m20,m25
What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?
Define line type?
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.
flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force
What black man invented the clothes dryer?
What is rate of concrete surface rendering work per sqm
What is kn measurement?
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
List out some of the common problems that architect have to tackle it?
1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...
02. a. The diagonal of a 9 cube…………… 1 b. Surface area of 9 cube…………… 1 c. Volume of 1-3 cube …………… 1 d. Compressive area of 6 cube …………… 1 e. Top & Bottom face of a Cylinder/Cube is to be proper leveled to deliver the…………………………..…… properly.
what is the use of steel rods of 16mm or 20mm used for 4.45mts for closing gutter.one mate consumes how many kgs with a gap of 6inches.
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
use ofr concrete as per grade ?