If the design CBR of subgrade is 10% but the material available on site is 30%.will you compact less(like 90%) where you get desirable CBR(10%).
Answer Posted / hitesh kanpariya
No, sometimes material delivered on the site may be different or we can say its natural material so base on that we have to compact it.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
how to calculate the concrete mix m30 by volume
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
what do you mean by yeild stress of a material? What will happen when hit is given to cement?
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
What is the minimum size of the particles of silt soil?
Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?
Why reinforcement done in shorter span in two way slabs
What are the applications of the modulus of elasticity?
what is the theoritical percentage of concrete cubes testing per day?
if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????
How much area will be covered in 1 litre of Velvet touch paint in normal wall condition
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
How to find permissible diagonal tensile stress in reinforced brick work
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
What are the different types of civil engineering?