If the design CBR of subgrade is 10% but the material available on site is 30%.will you compact less(like 90%) where you get desirable CBR(10%).
Answer Posted / hitesh kanpariya
No, sometimes material delivered on the site may be different or we can say its natural material so base on that we have to compact it.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
cement and sand required for one block of size 0.23*0.15*0.46
Forces in a Shear Wall are in plane or out of plane ?
Define Who designed the city of Washington DC?
very simple or less time consuming formula for reinforcement calculation by moment
What is the cemnent ratio
which type of instrument included in plumbing work?name of instrument?
What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?
What is limit state method and working stress method and ultimate method
What are the different methods for drawing an arc?
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
What is diversion tunnel in a dam?
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?
Difference between lime, distemper and plastic emulsion?
what is total volume of ingredients used in concrete accordingly
how much to get of BRC lapping in full yield and half yield ?