If the design CBR of subgrade is 10% but the material available on site is 30%.will you compact less(like 90%) where you get desirable CBR(10%).
Answer Posted / hitesh kanpariya
No, sometimes material delivered on the site may be different or we can say its natural material so base on that we have to compact it.
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
how to design and calculate materail quantity for concrete speedbreaker ?
What are the types of slump?
how to calculate mivan shuttering matrial
rate analysis hiring of generator 62.5 KVA
What is the standard unit weight of Cast Iron pipe of 200MM Dia.(pipe specification is IS1538)
sir how can we find the cement and sand required for making 4" drop
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
What is the life of anaerobic Digester if it is used for municipal solid waste digetion.
what is the ingredient value of 40mm and 20mm aggregates?
What is the diff between cad & cadd?
What is Critical path in Ms-Project ?
Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....
What is the difference between absorption & adsorption and sorption?
what are the grades of concrete?where and or what purpose a particular grade is used in a particular structure?