If the design CBR of subgrade is 10% but the material available on site is 30%.will you compact less(like 90%) where you get desirable CBR(10%).
Answer Posted / pranav pachori
NO FULL COMPACTION I.E 90%REQUIRED THOUGH WE CAN SUGGEST TO DESIGNER TO REDUCE THE THICKNESS OF SUB GRADE THOUGH GENERALLY SOIL NOT EXHIBIT SUCH A HIGH CBR LIKE 30% BECAUSE SUCH KIND OF HIGHER CBR BELONG TO GSB MATERIAL
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
How to activate isometric axes in cad?
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh
All aptitude question of Bechtel
What are the techniques to measure road difference?
For Wet Mix Mecadam design what is Optimum moisture content
what is the ingredient value of 40mm and 20mm aggregates?
What are the different types of runners?
1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?
Define a polyline?
What year was the keystone power plant in Indiana County constructed?
Process of pcc in wateredug
explain what do you mean by the property development.
Can a wave happen in the middle of the ocean like in the movie poseidon 2006?