Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to stop PGI?

Answer Posted / chandrakant jain

PGI can be Stopped.
Quality Check implemented in the Material Master The When
the material needs Quality ok through UD(usage Decision)

Path-Material master (mm02)->quality management->
inspection setup.

This can be done through QM module or user exit.

Delivery Creation can be Blocked from sales order.
1. Delivery Block In VOV8
2. Credit Limit Block. Through Static or Dynamic credit
check (Credit Management).
3. Status Group - Not Approved. Status Profile in BS02
create than assign it in VOV8 order Type.
4. User Exit

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

When you create an invoice can you carry out pricing again?

1040


Hi, I have advance payment scenario where customer want advance payment cannot be used against another sales order and against any credit limit. Let me put one example. Customer X is having credit limit of 1000 USD, if my client is received customized product order then he will take advance for this special order but customer X is already enjoying credit limit of 1000 USD. In this scenario my client wants advance payment received cannot use against any sales order and against any credit limit. If I will post advance payment in F-29 then customer credit exposure will decrease against credit limit in FD32 which will affect normal sales order credit limit. Here customer does not want to utilize advance payment against credit limit of customer which is use for normal sales order. Please suggest

4446


What’s forward scheduling and backward scheduling activator? There’s a concept called forward scheduling and backward scheduling logic when you do an availability check whenever your order is created system will check whether it’s forward scheduling or backward scheduling, if it’s fatal we have a concept of how is it working, how is that you created as part of your available promise concept? Whatever that date is being considered as part of the logic, whatever the date that is configured or we maintain the data to say know that system tell to create this output back scheduling

816


Can we assign multi distribution channel to a single customer in sap sd sales process. If yes then how?

1077


You want to set up a new condition type. Name the necessary steps you have to do if you want the system to determine the new condition type automatically during sales order entry?

1069


Name at least five features that you can control for the item category?

937


What is an outline agreement?

1025


Is it possible to create sales order for 40 items if the quotation is sent for 30 items?

1191


Can any body can give me the example for business scenarios in industry specific solution you work with for sap sd interview bez I just finished the training.

2389


Define sales document types?

1100


A bunch of data need to be imported. A huge no.of creations are required, how it is possible in sap?

1100


Is it possible to perform an availability check based on the plant yet exclude one storage location?

1048


In Order - what have you done exactly, did you do the entire setup in SAP, and if yes, can you walk me through it?

838


what are all the shipment activities.explain this process pls. its very urgent and what is t-code.

2043


Explain what is condition types?

1001