Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Concrete Mix designs for M15,M20,M25,M30 and M35

Answer Posted / prabu

m15-1;2;4,m20-1;1.5;3,m25-1;1;2,m-30,m35- depends on the mix

Is This Answer Correct ?    93 Yes 16 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what are the strength theories for yeilding and fracture materials. state the theory more suited for 1. mild steel or 2. concrete

4359


What is the difference between absorption & adsorption and sorption?

1210


What is construction mitigation management?

2335


types of laps in column

2377


I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations

1500


What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?

2732


Please design 12.5m long dubbly beam

1898


if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel

1413


pls tell me about method of cutting length of ties column

2600


As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.

1965


Differentiate orthographic and isometric projections?

1244


how to create our resume?

2182


Detection of a beam & a girder are––––

2224


what is the calculation of raw material for 0.35cum of m-15

1459


how to calculate load bearing column

3593