what happend if the protection ct is by mistake put instead
of measuring ct & vice versa?
Answer Posted / sujeet pandey
Measuring CT needs to be very precise so its coil are better
quality than the protection CT. In case of wrong
connection,there will wrong reflection of primary current
which is not desirable.
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
In Designing the rating & accessories of a MCCB how to choose the type of releases..means what is the basis for selecting, thermal magnetic, electromagnetic & microprocessr based releases
An ISP is granted a block of addresses starting with 150.80.0.0/16. The ISP wants to distribute these blocks to 2600 customers as follows. a) 200 medium size businesses; each needs 16 addresses b) 400 small businesses; each needs 8 addresses c) 2000 households; each needs 4 addresses Design the subblocks and give the slash notation for each subblock. Find out how many addresses are still available after these allocations.
How phase displacement change in the over current relay coils.
Why there are some equipment(i.e:TV) that using 2-pin plug instead of three? What happen if there is current leakage? Are we going to get electric shock??
What is effect on in zone and out zone fault if CT chosen for phase side is Vk/2<5mA and Neutral side is Vk/2<15mA on REF protection of Transformer
why we have and use 3 phase not 2 or 4 or other in power system?
Mr. mohh sahid m not satisfied for ur answer to the que weather the size of transformer increases or decreases withchange in fr for more detail go to the answer given by me
which is better to use svc or synchronous condenser why ?
What is the de rating factor of cable? What is the importance of the de rating factor in cable select
how much UPS neutral erath leakage current.
Can you explain about Restricited earth fault protection scheme
Its possible to use 3core 2R of 240 sq.mm cable for 3phases & separely 50sq.mm 3core cable fully for Neutral for connection of PCC to MCC 3ph..4wire system?
What is the meaning of utility ground and clean ground? How the distribution panel is grounded?
plz send me the procedure and syllabus for mseb exam
Keywords: Die, Card, Coin, B/N 2 To 12