A contract is to paint 3 houses. Mr brown takes 6 days to
paint a house. Mr black takes 8 days and Mr blue 12 days. Mr
brown leaves for a vacation after 8 days. Mr black works for
6 days from then.How many days would Mr blue require to
complete the contract?
Answer Posted / gayatri
4 days
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
There is a 4 inch cube painted on all sides. This is cut down into of 1 inch cubes. What is the no of cubes which have no pointed sides.
Jack and Jill went up and down a hill. They started from the bottom and Jack met Jill again 20 miles from the top while returning. Jack completed the race 1 min a head of Jill. If the hill is 440 miles high and their speed while down journey is 1.5 times the up journey. How long it took for the Jack to complete the race ?
The time showed by an analog clock at a moment is 11 am then 1234567890 hours later it will show the time as:
The time showed by the clock at a moment is 8 am then the respective time of after and before 42896 hours is :
2 persons are doing part time job in a company(say a and b). THe company is open for all the 7 days of the week.'A' works every second day.'B' works every 3rd day.If 'A'works on 1st june and 'B' works on 2nd june.Find out the date on which both 'A' and 'B' will work together.
Find perimeter of a trapezium with 3 sides given and distance between parallel sides given.
A person was fined for exceeding the speed limit by 10 mph. Another person was also fined for exceeding the same speed limit by twice the same. If the second person was travelling at a speed of 45 mph. find the speed limit .
The average of x and y is 6.5. if z=4,what is the average of x,y,z.
Find the value of @@+25-++@16, where @ denotes "square" and + denotes "square root".
Can you find out what day of the week was January 12, 1979?
A man buys 12 lts of liquid which contains 20% of the liquid and the rest is water. He then mixes it with 10 lts of another mixture with 30% of liquid.What is the % of water in the new mixture?
A 16 stored building has 12000 sq.feet on each floor. Company A rents floors and company B rents 4 floors. What is the number of sq.feet of unrented floor space.
There was a ques on work something like 2 typists type 2 papers in 4 hrs then in how much time will 5 typists take or something like that.
Find the next series number 1, 1, 2, 3, 6, 7, 10, 11, ?
if a man byes 1 lt of milk for 12 rs and mixes with 20% of water and sels it for rs 15 thgen what is percentage of gain