Answer Posted / gurjant sharma
1 mm for distant
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
why does the most of civil engg is not intersted to going for teaching field?
explain the advantages of total stasion
density of crush sand & crush stone or grit powder
what is the relation between pitch of steel and depth of slab?
pile load testing procedure
what is right & short method of measurement of slab&beam
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
What is fineness modulus ? and its sieve # ?
In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?
What is the largest concrete dam in the world?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
how to calculate detail quantity of bricks and mortar for 500 cu.ft masonry work. consider wall thickness 9 inches
What is the meaning of a blue land surveyors flag?