Neither the question, nor the answers are very focused here.
What type of tests are being discussed here? There are many
tests which can be performed on a capacitor bank. Mr.K.prabu
is requested to make his question clear. Other than on line
tests, the capacitor banks must be discharged and earthed by
suitable means before conducting any test. Capacitor banks
are discharged through resistance banks of suitable capacity.
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
Explain mechanical rotational system?
what is a power factor?
What happened when voltage will half value of current ...
what is conductor constant of raccun conductor
Starting times for soft starter & power factor is thier any standard or datas available in manufactures list. Kindly suggest.
For an induction motor wat is the loading/unloading cycle duration or interms of L/UL ratio/ percentage?
can anybody send me syllabus of rrb section engg (electrical). and also send previous question pepar...
how u select control transformer for a mccb panels or any panels?for expample we hav 440 volts maim supply and control volts is 230v?
A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.
What is the universal motor?
in parallel operation of power transformer why the distance between power transformer and capacitor bank feeder is necessary to know
how to calculate fault level?
what is the electrical?
why in the three pin plug all 3 pins are cutted ?
What we mean by vintage of an engine+Generator?