Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to test the vector groups of 3 winding transformer & phase
displacements

Answer Posted / moulali

to find phase displacement of 3 winding transformer, first of all consider the core construction of core and prepare sample model of core and draw a circle around the core which touches the end of the core arms. now core arm devides circle into three parts and measure the angle between two arms which is phase difference.

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is a types of short circuit and what is a types of distance protection tests

2257


How the frame size of a flange mounted AC induction motor is calculated?

2064


What are the basic properties of signal flow graph?

1215


What is polar plot?

1176


what is the significance of cabability curve of alternator

2228


A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

1795


33kv Rated output avilable in market (any where in india)

2076


what r PID controllers?why they r used?what is there purpose?plz Explain in detail

2073


can anyone explain the star-delta motor control wiring ,which wire go where and how they operate?

1451


why output is out of phase in case of common emitter?

2143


What is the difference between solid grounding and impedance grounding?

2116


How 48-relay (incomplete sequence) functions?

4100


Dear sirs, pls check this 4-20ma to RS485 module datasheet,pls guve me some suggestions. http://www.szsunyuan.com/sy/pro_more.asp?Productid=539 Thanks. E-mail:yunianjiang99@gmail.com

2084


Explain the terms real power, apparent power and reactive power for ac circuits and also the units used.

1098


Batteries used for electrical energy storage are a. Laclanche cells b. Edison cells c. Lead acid cells d.any of the above

1907