Answer Posted / ramdoss
In the british period itsely we are using 50 hz , so now
days all the manufacturing company designed his products in
50 Hz . Thi sis also indian standard rules
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Earth bits close or open. Which is correct
54 Comments Alok and Bhanu play the following min-max game. Given the expression N = 38 + X*(Y – Z) where X, Y and Z are variables representing single digits (0 to 9), Alok would like to maximize N while Bhanu would like to minimize it. Towards this end, Alok chooses a single digit number and Bhanu substitutes this for a variable of her choice (X, Y or Z). Alok then chooses the next value and Bhanu, the variable to substitute the value. Finally Alok proposes the value for the remaining variable. Assuming both play to their optimal strategies, the value of N at the end of the game would be?
Describe the control mechanism of missile launcher???
pls tell what are doing the three phase motor star and delta connetion with circuit diagram and control wiring .
what is the difference b/w absolute encoder and incremental encoder?
how to find the Motor,s insulation Power?
would you please give me any idea about the BARC interview question on electrical? i have an interview on 1st july.....plz hlp me.......its urgent......
how many single tension hardware are required on a double circuit transmission tower?
Why are lt windings placed near the core?
What are the causes of unbalanced current on 34.5kv feeder Ia=0.05,Ib= 0.25, Ic=0.15 and In=0.27 prior to tripping current are balance?
Witch do depand of Power factor and theory of power factor?
What is the diffrence (Technical & Construction ) between CBCT & Normal CT?
how to calculate fault level?
How do we arrive at selecting reactive capacitance value as 30% of h.p rating of motor?
How do i perform grounding of star point of Genset (400V) for making connection with step up transformer of DELTA-DELTA (400V to 20KV) ? while Genset itself has its own neutral and grounding bus bar inside genset breaker box whereas we have another neutral and grounding busbar in synchronizing panel next to genset at maximum distance of 6meter, would someone pls advice if we can only perform neutral grounding in synchronizing panel or should we ground neutral on both places inside genset breaker box and synchronizing panel.