How to calculate the Volume of PCC, Footing Base, Footing Column, Grouting, Base Plat and plinth beam
Answer Posted / suresh
any one Length X Bredth X Hight (LxBXH)
| Is This Answer Correct ? | 26 Yes | 3 No |
Post New Answer View All Answers
what is meant by residual strain?
How do we determine the specific gravity of a cement?
if 20mm aggregate is coming by weight 25 ton in a 10 wheeler hywa ,then what will be total volume of aggregate in cubic feet.
what discoveries did you have in relation to your course?
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.
Define What is the tensile strength of wood?
How to come 1.54 from dry to wet concrete?
Suppose you planning to paint newly fabricated workshop building made of structural steel of 10 tons total mass. How many litters paint primer for 1 coat and 2 coat of top coat?
What do you mean by the word 'shear'?
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?
What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?
How is calculate the cube molt
What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).