Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to test the vector groups of 3 winding transformer & phase
displacements

Answer Posted / sinnadurai

readers please provide

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what are the principles of a booster converter?

2062


Hi,I am working in abroad for more than 3 years in a company operating with 11kv and 6.4 MW power. I need c licence in India,can I? some other says only i can get if i work for 2 years in india only! anybody kindly clarify by doubt.Thanks

1846


thyristor controlled APFC panel design parameter?

1776


Why arc quenching is used in Diode ?

2144


Earth is a conductor or load?then ammeter connect to 3- phase supply,it shows the measurents or not?

2065


What is the cut-off rate?

1145


What are root loci?

1084


Define the term factor of inertia.

2091


Application Comparison between 22KV (UE)and 33KV (E) system. Are we allowed to use 33KV (E) cable in lieu of 22KV (UE) cable. What are the technical disadvantages.

2811


why we setting 95 deg and 105 deg in wti and oti of distibution transformer ? give the reson for that ?

3138


HOW CAN I GET 5CORE HO7 CABLE SIZE IF I HAVE 1800A?

2039


What are the reasons for the parallel operation of transformers?

1124


True or false question. 1.The fuse provide phase and neutral 2.power loss in electrical circuit can take place in (resistance or inductance or capacitance). 3.two phase system each phase has separated by a phase difference of (90 or 180 or 270 or 45). 4.3 phase balanced star connected load neutral current shall be (line current or phase current or zero or unity)

1568


explain working principle of earth leakage relay

3696


write down the formula of cable size in RM if current is 50Amp.

1333