Answer Posted / yo !!
there are three types of metrics :
1. Product metrics : product metrics describes the characteristics of the product such as size, design features, performance, quality, etc.
2.Process metrics : process metrics describes the effectiveness and quality of a process that is used to produce a software. Ex: efforts required,time needed, defect removal,etc.
3.Project metrics : It describes the characteristics of a project and also its execution. For ex: no. of software developers, staffing, cost and schedule,etc.
| Is This Answer Correct ? | 10 Yes | 0 No |
Post New Answer View All Answers
Is it possible to do load testing in POWERMHS? If yes how do you do that?
Explain what should your qa documents include?
Hi QA, Do any QA's give us the detail status of review happening during the entire life cycle (if templates includes it will be very useful for us) ?
A power plant control system?
What is the role of qa in a project development?
What is negative testing? How is it different from positive testing?
List out the roles of quality assurance engineer?
can you explain the software testing life cycle?
What is backus-naur form?
Tell me about any quality efforts you have overseen or implemented.
An automated bank teller system?
Can you build a good audit trail using Compuware's QACenter products. Explain why.
what are the tables in testcases?
Why is automation testing preferred over manual testing?
Testing terminologies followed by Google