how much brick,cement,and sand required in 1cum
brickwork(1:4)
Answer Posted / suman kumar
cement =1.15 bags
send = 9.18 cft
Brick = 500 nos
| Is This Answer Correct ? | 21 Yes | 30 No |
Post New Answer View All Answers
For Wet Mix Mecadam design what is Optimum moisture content
What are the different methods for drawing an arc?
How to arrive dry volume of concrete (1.52 to 1.57) ?
a sewer which receives the discharge of no. of house sewer is called house sewer lateral sewer intrcepting sewer sub-main sewer
Define What is the tensile strength of wood?
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
Which Types Of Bricks ?
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
Why joints are provided?
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
Define aligned dimension?
what is hydrostatic paradox?
Detection of a beam & a girder are––––