Could anybody pls give ans of boiler 3 element control system?
Answer Posted / naik muhammad
Most boilers of medium to high pressure today use a “3-
element” boiler control strategy. The term “3-element
control” refers to the number of process variables (PVs)
that are measured to effect control of the boiler feedwater
control valve. These measured PVs are:
▪ liquid level in the boiler drum,
▪ flow of feedwater to the boiler drum, and
▪ flow of steam leaving the boiler drum.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
In turbine, what does term CDP, NI, NH, HSSOC, means
why fuse block is not used for AI signal?
Emergency Shutdown Systems/ Plant Shutdown System.
what is difference between fork type and capacitance type level switch. where it is using
How to Calibrate Vibration Probe (Axial, Redial) in field
i have done DAE in Instrumentation and Process Control. i have applied for an apprentice training in chemical company after three day my interview will be conduct but i need more information about industrial process control and controller. my e mail is imran_dilsetu@yahoo.com please tell me interview question relative to instrumentation ?
how many types of spped sensors n vibration sensors?their basic principle n connection?
protection relay watchdog contact operation?
how pressure transmitter work, what is its principal to measure and how its generate signal. for pressure transmitterinstallation which precautions must be taken ??
How is work 5/2 sov?
What is defferent betwen ESP &PCP PUMP .HOW IT IS WORK?
Isometric drawings are generated during _________________ phase of a project
the whole paper was based on Transducers..questions like define repeatability, error,accuracy,precision..den there were many q. on the conversion of Pa to mmHg and other units.. also..der wer few Q. on some level sensors(with diagram)
Make Heater Process Logic.
Describe the typical instrumentation used in monitoring the performance of a shell and tube heat exchanger.