Answer Posted / ravikant sharma
1440 KG OR 28.8 BAGS
| Is This Answer Correct ? | 39 Yes | 2 No |
Post New Answer View All Answers
Define What are the materials used in building a gravity dam?
How do you compute volume of airflow?
what is labour consume factor in residential projects
What is the ideal size of the living room ranges from small to large size?
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
How much material is required for constructing a 2 Lane 2Km rigid pavement road
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
Explain the different types of building contracts?
Reinforcement details at hinged joint
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
Will going from a 3-tap to 6-tap increase water pressure?
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.
How much cum. Brick work can do by 1 madon