for what perpuse we use CBR test in road project?

Answer Posted / rajasekhar chennuri

CBR main role is for finalisation of pavement thickness as
per PLATE-1 & PLATE-2 from IRC:37-2001

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the water cement ratio for plastering

1181


crank types

1902


What are your goals?

2135


What is the coeffiencent Friction Angle between Steel and Ashphalt?

2534


Is it possible to make a feature using an overdefined sketch?

775






what are the values of compressieve strenght?

1611


Please let me know what is the simplest way of Calculating Mix Designs

1527


acceptance criteria for concrete works

1701


What is c.g.i sheet which used for roof??

1475


Explain what is the difference between built area and super built up area?

704


What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?

1975


WHAT WII BE THE WATER ABSORPTION POWER OF WOOD ?

1795


What will you do if you encounter problems like accidents?

621


Explain the mechanism of cavitations in pipes and drains?

670


asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream

1476